Subfloor Repair Kelowna

Subfloor Repair Kelowna

A new floor is only as good as the surface beneath it. Our crews assess every subfloor during your free estimate and handle whatever prep is needed: self-leveling compound, soft-spot replacement, moisture barriers, or full plywood overlay.

What's Included

  • Subfloor moisture testing (concrete + wood)
  • Self-leveling compound for uneven concrete
  • Soft-spot or rotted plywood replacement
  • Vapour barrier installation
  • Floor flatness verification with a 10-ft straightedge
  • Acoustic underlayment for condos and second floors

When you need this

  • Concrete basement floor isn't flat
  • Old hardwood has dips, cups, or squeaks
  • Replacing carpet on a second floor — floor is no longer flat under the carpet
  • Switching from carpet to a hard surface and want it to look right

Pricing

Light prep included in install · Self-leveling: $2–$5/sqft over baseline · Plywood overlay (1/4" or 1/2"): $3–$6/sqft · Vapour barrier on concrete: $0.50–$1.50/sqft.

Typical Timeline

Light prep adds 0–2 hours. Self-leveling adds a half day plus 24-hour cure before flooring install. Plywood overlay adds a full day.

Common Questions

Why does subfloor flatness matter?+
Hard flooring (LVP, hardwood, laminate, tile) can fail when installed over uneven subfloors — gaps, cracking, lifting, broken click-locks. Manufacturer warranties require a flat, dry subfloor.
How flat does a subfloor need to be?+
Most flooring manufacturers spec 3/16" variation over a 10-foot span, or 1/8" over 6 feet. We measure during the estimate.
Can subfloor repair be done as part of my flooring install?+
Yes — it's the most common way to do it. Subfloor prep happens day 1 of the install, then flooring goes in day 2.

Ready to start?

Free in-home estimate. No pressure.